S09-HW Soln-Ch13 - Chapter 13: Resource Management/MRP...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 13: Resource Management/MRP Homework Problems/Solutions Problems: #1. Given the following diagram for a product, determine the quantity of each component required to assemble one unit of the finished product. #2. The following product structure tree indicates the components needed to assemble one unit of product W. Determine the quantities of each component needed to assemble 100 units of W. #3. Eighty units of end item E are needed at the beginning of week 6. Three cases (30 units per case) of J have been ordered and one case is scheduled to arrive in week 3, one in week 4 and one in week 5. Note: J must be ordered by the case, and B must be produced in multiples of 120 units. There are 60 units of B and 20 units of J now on hand. Lead times are two weeks each for E and B, and one week for J. F(2) G H J(2) D(4) L(2) J(2) A(4) D(2) E A B(2) C(4) D(2) E E(2) F D(3) G(2) W D J(4) F(2) B(2) J(3) E
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Chapter 13: Resource Management/MRP Homework Problems/Solutions a. prepare a material requirements plan for component J. b. Suppose that in week 4 the quantity of E need is changed from 80 to 70. The planned order releases through week 3 have been executed. How many more Bs and Js will be on hand in week 6? #4: End item P is composed of three subassemblies: K, L, W. K is assembled using 3 Gs and 4 Hs. L is made of 2 Ms and 2 Ns. W is made of 3 Zs. On-hand inventories are 20 Ls, 40 Gs and 200 Hs. Scheduled receipts are 10 Ks at the start of week 3, 30 Ks at the start of week 6 and 200 Ws at the start of
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/19/2009 for the course IDS IDS302 taught by Professor Rainer during the Spring '09 term at Institute of Business Administration.

Page1 / 7

S09-HW Soln-Ch13 - Chapter 13: Resource Management/MRP...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online