Building_Project_Dates_Guidelines_F09_rev2

Building_Project_Dates_Guidelines_F09_rev2 - ENGRI 1160...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ENGRI 1160 MODERN STRUCTURES Fall 2009 LABORATORY BUILDING PROJECT: LABORATORY BUILDING PROJECT: Key Dates and Guidelines Key Dates and Guidelines Your project is to design and construct a model building frame to resist a simulated earthquake. This document contains key dates and guidelines for your project. Project objectives, rules, and specifications are discussed in another handout ( LABORATORY LABORATORY BUILDING PROJECT: OB JECTIVE, RULES, AND SPECIFICATIONS BUILDING PROJECT: OB JECTIVE, RULES, AND SPECIFICATIONS). Your designs will be judged by upper-class CEE students and CEE faculty, and loaded to failure (maybe!) on the earthquake simulating shake-table. Key dates: Tuesday, October 20 :Finalize design teams. Submit Team Name/Team Leader name via Blackboard. Wed.Thurs.Fri., Oct. 28-30 : PDR: Submit sketches of preliminary designs for review/critique during the afternoon project meetings. Please get together with your partners well ahead of time to exchange ideas and develop your designs. Friday, Nov. 6: Deadline for submitting required Preliminary Materials Schedule Tuesday, Nov. 24 : CDR: Buildings submitted/judged in McManus Lounge, with Final Materials Schedule,
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

Building_Project_Dates_Guidelines_F09_rev2 - ENGRI 1160...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online