scan00062 - PART 3 As-Built Cumulative Progress Curve...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: PART 3. As-Built Cumulative Progress Curve Analysis — The as-scheduled cumulative progress curve for Digger Construction, Inc., is provided below. Your responsibility is to answer the required questions. Value 20 points. ‘.uation: From the field inspection reports, you learn that the Project Engineer approved the following interim work progress percentages {see text box} for work performed through the 7th month. Reguired: 1) Plot, sketch, and correctly label the as-built progress schedule through the seventh month. 2) The original contract bid price for this work was $22 448, 822 and the contract includes provision for retention of retainage at 5% and interim progress payments at net 30 days until final acceptance' 15 granted. a) What is the actual dollar amount {to the neatestpg guy} of the payment for as— built work that the general contractor expects to receivein the mail from the owner 6th month = 70% on or about the end of month #6? mmm 7th month = 75% b) What' 15 the value of the contractor’s ‘nvoice presented to the engineer ,1 a ‘7‘ WK - ‘ payment at the end of month #7. m J $ :2) 87) 874 8 5C“ a) 05%)(21‘1‘1$87.2):6b4075'7i‘ito) 05(Hai0181‘ié.) = Project Completion Report (As~built % cumulative) 1st month = 6% 2d month = 12% 3d month = 23% 4th month = 40%‘ 5th month = 58% ioX Daiczzwaszrayuzw‘ii i0- 0 (n W: or / Y/ . Di er Construction Inc. 100 98 100 __ ______________________________ M ................... 7 ........... W ______ an—Wil ,&______.___ NW 90 ‘ ‘ ,, Bow 1 i 80 ‘ W A; ~77#——i / : i 1 7077 ~ — ; m 1 7 ~ 77 :3 60 "m p ,7 a”)? , ,, E 50 7 5 E 3 of L: 40 7 1' 7 , ,\ 30 ,, , fl {3 20 , 16 3 i 3 10 i 0 , "1.— 1 . 0 1 2 3 4 5 6 7 8 9 10 Time ~ (Months) +As-scheduied / 2481‘3W08.doc / J ...
View Full Document

{[ snackBarMessage ]}