ISSUES DURING THE CONSTRUCTION PHASE CHAPTER - 3
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
PROJECT REWORK REDUCTION ± The Need
Background image of page 2
ACCEPTANCE PERIOD/WITHDRAWAL ± Bidding Period ± Acceptance Period Chronology of Bid Procedure
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
AWARD OF CONTRACT/ NOTICE TO PROCEED (NTP) ± Notification of award of contract – by a letter ± NTP consummates contractual relationship from legal point of view ± The proposal (offer) – acceptance protocol of contractual law satisfied ± NTP establishes date from which the beginning of the project calculated ± Calendar days are used
Background image of page 4
CONTRACT AGREEMENT ± Formal Contract Agreement
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
TIME EXTENSIONS ± Unforeseen Conditions – Soil Condition ± Owner Changes – Design Changes ± Acts of God – Weather Delay ± Substantial Completion ± BOD ± Punch List ± Owner accepts the facility as complete
Background image of page 6
CHANGE ORDERS ± Any alterations of Contract Documents ± Implementing Cos are specified in General Conditions
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CHANGE CONDITIONS ± Unforeseen Soil Conditions
Background image of page 8
VALUE ENGINEERING ± Value Engineering – Alternative product
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 10
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/11/2009 for the course CEIE 463 taught by Professor Bhargava during the Spring '09 term at George Mason.

Page1 / 16

Ch 3 Issues during - CHAPTER 3 ISSUES DURING THE CONSTRUCTION PHASE PROJECT REWORK REDUCTION The Need ACCEPTANCE PERIOD/WITHDRAWAL Bidding Period

This preview shows document pages 1 - 10. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online