Ch. 6 PROJECT PLANNING

Ch. 6 PROJECT PLANNING - CHAPTER - 6 PROJECT PLANNING Click...

Info iconThis preview shows pages 1–8. Sign up to view the full content.

View Full Document Right Arrow Icon
Click to edit Master subtitle style PROJECT PLANNING CHAPTER - 6
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
WEB BASED PROJECT MANAGEMENT Ø The Need (1-2% of project cost on paperwork to support information transfer) Ø The Technology o Web-based project management application
Background image of page 2
INTRODUCTION Ø Scope of Work Ø Work elements of building blocks Ø Sub Elements referred to as work packages Ø Summation of work packages in a hierarchical format is called work breakdown structure (WBS) Ø Project Planning = Work Breakdown + Work Sequencing
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Figure 6-1 Work Breakdown Structure (WBS) Example
Background image of page 4
Figure 6-2 The Planning/Management Cycle
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
DEVELOPING the WBS Ø Building blocks of WBS Ø “The progressive hierarchical breakdown of the project…” Ø Guidelines to establish WBS o Must be distinguishable o Must have unique starting and ending plans o Should have unique budget o Should be small enough that precise measurement of progress is possible
Background image of page 6
A WORK BREAKDOWN EXAMPLE Ø Gas Station Appendix 1 Ø In construction, various aspects contribute to breakdown into packages
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 11/11/2009 for the course CEIE 463 taught by Professor Bhargava during the Spring '09 term at George Mason.

Page1 / 15

Ch. 6 PROJECT PLANNING - CHAPTER - 6 PROJECT PLANNING Click...

This preview shows document pages 1 - 8. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online