Problems for In-Class Discussion

Problems for In-Class Discussion - 1 Material Requirement...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 Material Requirement Planning 1. The Bloomington Bike Company produces two models: the Basic and the Supra. Herb Hoosier, the owner, plans to have 15 Basics and 10 Supras eavailable ach week during periods 4 to 8. Product structure trees for each bike are shown below: B S X M W K(2) F F W(2) Q Develop a materials requirement plan for component parts K and W over the next eight weeks. Data on all lead times, current inventory and ordering rules are given below: Scheduled receipts are: Period 1: 20 Bs, 18 Ws; Period 2: 20 Ss, 15 Fs. ITEM LEADTIME (WKS) ON HAND LOT-SIZING RULE B 2 5 Lot-for-lot S 2 2 Lot-for-lot X 1 5 Q = 25 W 2 2 Multiples of 12 F 1 10 Q = 30 K 1 3 Lot-for-lot Q 1 15 Q = 30 M 1 Lot-for-lot Part: Week Number 1 2 3 4 5 6 7 8 Gross requirements LT: Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 2 Part: Week Number 1 2 3 4 5 6 7 8 Gross requirements LT: Scheduled receipts Projected on hand Net requirements Planned-order receipts...
View Full Document

Page1 / 3

Problems for In-Class Discussion - 1 Material Requirement...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online