Ch 14 MRP - 50 150 Level: 0 Parent: Quantity: Item: H Lead...

Info iconThis preview shows pages 1–22. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 50 150 Level: 0 Parent: Quantity: Item: H Lead Time: 1 Lot Size: L4L Week No. 1 2 3 4 5 6 7 8 9 10 11 12 Gross requirement 100 50 Scheduled receipt 5 Order release 50 K Gross requirement 1 00 5 On hand: 1 00 Ch 14 MRP 14.1 An exploded bill yields the following: Item J: 200 units; Item K: 200 1 = 200 units; Item L: 200 4 = 800 units; Item M: 200 2 = 400 units. 14.2 The time-phased assembly plan for the gift bags is: Someone should start on item M by noon. On hand Net requirement 100 50 Planned order receipt 100 50 Planned order release Net requirement 5 Order receipt 5 Order release 50 50 Level: 1 Parent: A, H Quantity: 1X Item: C Lead Time: 2 Lot Size: L4L Week No. 1 2 3 4 5 6 7 8 9 10 11 12 Gross requirement 100 100 50 50 150 Scheduled receipt D Gross requirement 50 1 50 On hand: 5 50 Net requirement 1 50 Order receipt On hand 50 Net requirement 50 50 100 50 50 150 Planned order receipt 50 100 50 50 150 Planned order release 50 100 50 50 1 50 Order release 1 50 E Gross requirement 50 1 00 1 50 On hand: 7 5 75 25 Net requirement 75 1 50 Order receipt 75 1 50 Order release 75 1 50 14.11 (a) (b) F Gross requirement 5 1 00 50 1 00 1 50 On hand: 7 5 7 5 25 Net requirement 75 50 1 00 1 50 Order receipt 75 50 1 00 1 50 Order release 7 5 5 1 00 1 50 G Gross requirement 5 1 00 50 1 00 1 50 On hand: 7 5 7 5 25 Net requirement 75 50 1 00 1 50 Order receipt 75 50 1 00 1 50 Order release 7 5 50 1 00 1 50 (b)...
View Full Document

Page1 / 23

Ch 14 MRP - 50 150 Level: 0 Parent: Quantity: Item: H Lead...

This preview shows document pages 1 - 22. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online