LEED Construction

LEED Construction - LEED for New Construction &...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: LEED for New Construction & Major Renovations Version 2.2 For Public Use and Display October 2005 LEED for New Construction Rating System v2.2 Table of Contents Introduction 4 Sustainable Sites 8 SS Prerequisite 1: Construction Activity Pollution Prevention 8 SS Credit 1: Site Selection 9 SS Credit 2: Development Density & Community Connectivity 10 SS Credit 3: Brownfeld Redevelopment 11 SS Credit 4.1: Alternative Transportation: Public Transportation Access 12 SS Credit 4.2: Alternative Transportation: Bicycle Storage & Changing Rooms 13 SS Credit 4.3: Alternative Transportation: Low Emitting & Fuel Efcient Vehicles 14 SS Credit 4.4: Alternative Transportation: Parking Capacity 15 SS Credit 5.1: Site Development: Protect or Restore Habitat 16 SS Credit 5.2: Site Development: Maximize Open Space 17 SS Credit 6.1: Stormwater Design: Quantity Control 18 SS Credit 6.2: Stormwater Design: Quality Control 19 SS Credit 7.1: Heat Island Eect: Non-Roo 20 SS Credit 7.2: Heat Island Eect: Roo 21 SS Credit 8: Light Pollution Reduction 22 Water EfFciency 24 WE Credit 1.1: Water Efcient Landscaping: Reduce by 50% 24 WE Credit 1.2: Water Efcient Landscaping: No Potable Water Use or No Irrigation 25 WE Credit 2: Innovative Wastewater Technologies 26 WE Credit 3.1: Water Use Reduction: 20% Reduction 27 WE Credit 3.2: Water Use Reduction: 30% Reduction 28 Energy & Atmosphere 29 EA Prerequisite 1: Fundamental Commissioning o the Building Energy Systems 29 EA Prerequisite 2: Minimum Energy Perormance 31 EA Prerequisite 3: Fundamental Rerigerant Management 32 EA Credit 1: Optimize Energy Perormance 33 EA Credit 2: On-Site Renewable Energy 36 EA Credit 3: Enhanced Commissioning 37 EA Credit 4: Enhanced Rerigerant Management 39 EA Credit 5: Measurement & Verifcation 41 EA Credit 6: Green Power 42 LEED for New Construction Rating System v2.2 Materials & Resources 43 MR Prerequisite 1: Storage & Collection of Recyclables 43 MR Credit 1.1: Building Reuse: Maintain 75% of Existing Walls, Floors & Roof 44 MR Credit 1.2: Building Reuse - Maintain 95% of Existing Walls, Floors & Roof 45 MR Credit 1.3: Building Reuse: Maintain 50% of Interior Non-Structural Elements 46 MR Credit 2.1: Construction Waste Management: Divert 50% From Disposal 47 MR Credit 2.2: Construction Waste Management: Divert 75% From Disposal 48 MR Credit 3.1: Materials Reuse: 5% 49 MR Credit 3.2: Materials Reuse: 10% 50 MR Credit 4.1: Recycled Content: 10% (post-consumer + 1/2 pre-consumer) 51 MR Credit 4.2: Recycled Content: 20% (post-consumer + 1/2 pre-consumer) 52 MR Credit 5.1: Regional Materials: 10% Extracted, Processed & Manufactured Regionally 53 MR Credit 5.2: Regional Materials: 20% Extracted, Processed & Manufactured Regionally 54 MR Credit 6: Rapidly Renewable Materials 55 MR Credit 7: Certied Wood 56 Indoor Environmental Quality 57 EQ Prerequisite 1: Minimum IAQ Performance 57 EQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control 58 EQ Credit 1: Outdoor Air Delivery Monitoring...
View Full Document

Page1 / 78

LEED Construction - LEED for New Construction &...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online