A4 - CIV 207 Winter 2009 Assignment#4 Friday January 30th...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
CIV 207 – Winter 2009 Assignment #4 Friday, January 30 th Complete the first three questions. Submit your work to Box #5 on the 4 th floor of the MacDonald building by 12 noon on Tuesday February 10 th . No late submissions will be accepted. The second set of three questions are for practice only. Groups of up to 3 members are permitted. Clearly print your names and student numbers on your submission. Ensure that the submission is properly stapled. 6.92 The steel [G = 12,000 ksi] pipe shown is fixed to the wall support at C. The bolt holes in the flange at A were supposed to align with mating holes in the wall support; however, an angular misalignment of 2° was found to exist. To connect the pipe to its supports, a temporary installation torque T B must be applied at B to align flange A with the mating holes in the wall support. The outside diameter of the pipe is 3.50 in. and its wall thickness is 0.216 in. a) Determine the temporary installation torque T
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/01/2009 for the course CIVE 207 taught by Professor Shao during the Winter '09 term at McGill.

Ask a homework question - tutors are online