{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

02-0981.TOC.072602 - INITIAL STUDY/MITIGATED NEGATIVE...

Info icon This preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION SANTA BARBARA CHANNEL COASTAL HAZARDS REMOVAL PROJECT SANTA BARBARA COUNTY AND VENTURA COUNTY CALIFORNIA Prepared for: California State Lands Commission 100 Howe Avenue, Suite 100 South Sacramento, CA 95825-8202 Contact: Mr. Eric Gillies (916) 574-1897 Prepared by: Padre Associates, Inc. 5951 Encina Road, Suite 209 Goleta, CA 93117 Contact: Simon A. Poulter 805-683-1233 July 29, 2002
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Initial Study California State Lands Commission Santa Barbara Channel Hazards Removal Project Table of Contents 1.0 ENVIRONMENTAL CHECKLIST INFORMATION 1.1 BACKGROUND INFORMATION ................................................................. 1 1.1.1 Project Title ...................................................................................... 1 1.1.2 Lead Agency Name and Address ..................................................... 1 1.1.3 Contact Person and Telephone Number .......................................... 1 1.1.4 Project Location ................................................................................ 1 1.1.5 Project Sponsor’s Name and Address .............................................. 1 1.2 PROJECT SETTING .................................................................................... 7 1.2.1 Agency Jurisdiction .......................................................................... 7 1.3 PROJECT BACKGROUND .......................................................................... 9 1.3.1 Purpose and Need ........................................................................... 9 1.3.2 Description of the Hazards ............................................................... 9 1.3.3 Project Site Descriptions ................................................................ 15 1.4 CONSTRUCTION PLAN AND DESCRIPTION .......................................... 19 1.4.1 Contractor Information .................................................................... 19 1.4.2 Hazard Structure Removal Methodology ........................................ 19 1.4.2.1 Beach/Beach
Image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern