Project_Simulation_Presentations_-_Marking_Criteria

Project_Simulation_Presentations_-_Marking_Criteria -...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Assignment Team Structure and Ground Rules Name of the Team Date Criteria Max  Points Actual  Points Comments Defined Structure in the Team 1 Roles defined by area of expertise 1 Specific responsibilities defined for each role 1 Use of RAM to present roles and  responsibilities 1 Ground rules clearly defined 1 Overall presentation 1 Total 6 Criteria Max  Points Actual  Points Comments Clear description of project objectives in terms  of time and budget 1 Success criteria clearly defined:  win the  contract with Hamil Homes 1 High level description of what the project is  delivering (a model home) 1 Clear definition of boundaries, what is in scope  and, most important, what is out of scope 1 Assumptions and Constraints 1 Assignment Scope Statement Name of the Team Date
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Overall presentation 1 Total 6 Criteria Max  Points Actual  Points Comments Stakeholders properly identified 1 Stakeholder information needs properly 
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/03/2009 for the course PROJECT MA mgmt1140 taught by Professor Dibel during the Spring '09 term at Conestoga.

Page1 / 6

Project_Simulation_Presentations_-_Marking_Criteria -...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online