wsj_0050 AE

wsj_0050 AE - (NP-SBJ-1 (NNS Terms) ) (VP (VBD were) (RB...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Sheet1 Page 1 ( (S (VP (VBD said) (SBAR (-NONE- 0) (S (NP-SBJ (PRP it) ) (VP (VBZ has) (VP (VBN reached) (NP (NP (DT an) (NN agreement) (S (-NONE- *ICH*-1) )) (PP (IN in) (NP (NN principle) )) (S-1 (NP-SBJ (-NONE- *) ) (VP (TO to) (VP (VB buy) (NP (NP (NP (NNS buildings) ) (CC and) (NP (JJ related) (NN property) )) (PP-LOC (IN in) (NP (NP (NNP Albany) ) (, ,) (NP (NNP Ga.) ) (, ,) ))) (PP-CLR (IN from) (NP (NNP Bridgestone\/Firestone) (NNP Inc) ))))))))))) (. .) )) ( (S
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (NP-SBJ-1 (NNS Terms) ) (VP (VBD were) (RB n't) (VP (VBN disclosed) (NP (-NONE- *-1) ))) (. .) )) ( (S (NP-SBJ +S1 (DT The) (NN tire) (NN maker) ) (VP (VBD said) (SBAR (-NONE- 0) (S (NP-SBJ +I (DT the) (NNS buildings) ) (VP (VBP consist) (PP-CLR (IN of) (NP (NP (QP (CD 1.8) (CD million) ) (JJ square) (NNS feet) ) (PP (IN of) (NP (NN office) Sheet1 Page 2 (, ,) (NN manufacturing) (CC and) (NN warehousing) (NN space) )) (PP-LOC (IN on) (NP (NP (CD 353) (NNS acres) ) (PP (IN of) (NP (NN land) )))))))))) (. .) ))...
View Full Document

This note was uploaded on 12/03/2009 for the course LIGN 7 taught by Professor Kehler during the Winter '08 term at UCSD.

Page1 / 2

wsj_0050 AE - (NP-SBJ-1 (NNS Terms) ) (VP (VBD were) (RB...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online