ACIS 222 Job-order Costing Reading: Eldenburg et al. (2008) Chapter 13
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Ch13- Ch13- 2 Key Topics The flow of costs in the manufacturing process Allocating overhead costs to jobs actual vs. normal costing Journal entries The uses and limitations of job costing
Background image of page 2
Ch13- Ch13- 3 Job Order Costing wide variety of distinct products costs accumulated by job unit cost computed by dividing job costs by units produced by that job
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Ch13- Ch13- 4 Process Costing homogeneous products costs accumulated by process or department unit cost computed by dividing process costs of the period by the units produced in the period
Background image of page 4
Ch13- Ch13- 5 Flow of costs through the manufacturing process Direct labour Non- manufactu ring costs Direct materials Overhead Finishe d goods invento ry Work in process invento ry Revenue – COGS Gross margin Other expenses Operating income Expensed as period costs Income statement Balance sheet Traced Allocated
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Ch13- Ch13- 6 Example 1: Solution (a) total cost of the job Direct materials Direct labour Overhead Total cost (b) unit cost (c) price
Background image of page 6
Ch13- Ch13- 7 Source documents Materials cost: Materials requisition forms when materials issued to production identify job number quantity of materials type of materials cost of materials
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Ch13- Ch13- 8 Requisition No._______ Date:______                   Department_________        Job No._____ Description      Quantity           Cost/unit         Total Cost Delivered By___________   Received by______________
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 30

3.15 may%2013%20%26%2018%20ch%2013.PPT - ACIS 222 Job-order...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online