Homework7 - ENGRI 1101 Engineering Applications of OR Fall...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ENGRI 1101 Engineering Applications of OR Fall 2008 Homework 7 The Transportation and Assignment Problems Due date: 4:00pm on Monday, October 20, 2008 in the ENGRI 1101 box at the west end of the corridor on the second Foor of Rhodes Hall, where it connects to Upson. Reading assignment: Handout 7 and Chapter 3 of Winston (included in coursepack), at least through section 3.5. Make sure to put your name on the ±rst page and staple the problems in order. 1. (40 points) Consider the assignment problem that corresponds to the following cost matrix. 5 7 11 14 6 2 9 3 4 7 12 6 8 5 9 5 (a) (15 points) Suppose that we subtract now 15 from all the entries in the ±rst row of the matrix. Explain carefully, why the resulted problem de±ned on the new cost matrix, is equivalent to the original one. (b) (25 points) Apply the Hungarian algorithm to solve the given (original) assignment problem. 2. (30 points) (Adapted from Winston) A shoe company forecasts the following demands for pairs of shoes
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 12/25/2009 for the course ENGRI 1101 at Cornell University (Engineering School).

Page1 / 2

Homework7 - ENGRI 1101 Engineering Applications of OR Fall...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online