MRP and ERP -part B

MRP and ERP -part B - 1/5/10 MRPandERPpartB...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Click to edit Master subtitle style 1/5/10 MRP and ERP -part B Suman Niranjan
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1/5/10 Inventory Records One of the three primary inputs in MRP Inventory record refers to storage of information  on  status of each item by time period Time buckets Gross requirements Scheduled receipts Amount on hand Lead times Lot sizes And more … 22
Background image of page 2
1/5/10 Inventory Requirements Net requirements : Available Inventory : 33 Net Requirements = Gross Requirements – Available   Inventory Available Inventory = Projected on hand – Safety stock  – Inventory allocated to other items
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1/5/10 Assembly Time Chart 44 1 2 3 4 5 6 7 8 9 1 0 1 1 Procurement  of raw  material  D Procurement  of raw  material  F Procurement  of part C Procurement  of part H Procurement  of raw  material  I Fabricati on of part G Fabricati on of part E Subassembly  A Subassembly  B Final  assembly and  inspection
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 14

MRP and ERP -part B - 1/5/10 MRPandERPpartB...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online