Analysis-of-PWD-Schedule-of-Rates-2018.pdf - ANALYSIS OF PWD SCHEDULE OF RATES 2018 FOR CIVIL WORKS FIFTEENTH EDITION PUBLIC WORKS DEPARTMENT GOVERNMENT

Analysis-of-PWD-Schedule-of-Rates-2018.pdf - ANALYSIS OF...

This preview shows page 1 out of 734 pages.

You've reached the end of your free preview.

Want to read all 734 pages?

Unformatted text preview: ANALYSIS OF PWD SCHEDULE OF RATES 2018 FOR CIVIL WORKS FIFTEENTH EDITION PUBLIC WORKS DEPARTMENT GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH EFFECTIVE FROM 01 MAY 2018 © Public Works Department Published by: Public Works Department Purta Bhaban, Segun Bagicha Dhaka-1000. Fifteenth Edition 01 May 2018 Price: Tk. 20,000.00 Written suggestions on Analysis of PWD Schedule of Rates 2018 for Civil Works may please be addressed to Chief Engineer Public Works Department Purta Bhaban, Segun Bagicha Dhaka- 1000 Fax: +88-02-9562913 Email: [email protected] AUTHENTICATION The Fifteenth Edition of the Analysis of PWD Schedule of Rates 2018 for Civil Works that has been recommended by the committee formed vide memo. no. 5 sh-12/14-1551, dated 14-09-2017 is hereby authenticated and endorsed by the undersigned for official use in Public Works Department (PWD), Bangladesh with effect from 01 May 2018. Mohammad Rafiqul Islam Chief Engineer Public Works Department FOREWORD Public Works Department (PWD) under Ministry of Housing and Public Works is pleased to publish the Analysis of PWD Schedule of Rates 2018 for Civil Works. It is a comprehensive and useful document based on scientific assessment of inputs such as material, labour, machinery and other ancillary factors for various item of work. With the advent of modern construction technologies and emergence of new construction materials, the diversity and complexity of construction of buildings have increased manifold. Bangladesh is holding the status of developing country. Timely completion of construction projects is utmost important to hold that milestone and to accelerate achieving further goal, hope and aspiration of the nation. Unlike past, construction of high-rise buildings has become a necessity for optimum use of scarce land in a very populous country like Bangladesh. Building services and environmental issues are getting importance along the passage of time. As per the direction of the government, projects are now being planned keeping provisions for onsite waste management system. Use of environment friendly building materials are also being encouraged by the government. These have made a paradigm shift in the nature of construction of building in the public sector. Moreover, price of existing building materials also changed over time. These called for a revision of the existing Analysis of PWD Schedule of Rates. The current edition has been substantially enhanced to keep abreast of the modern construction practices and current market price of construction materials. Besides increased cost, there has been a spurt of new construction materials and introduction of mechanized construction techniques for rapid construction. Several new analysis pertaining to new materials and technologies in the construction sector have been included in this edition. Efforts have been made to incorporate as many items as possible which are being used in the construction sector of the country. However, due to high diversity in type and class of construction materials available in the market, only the most commonly used materials listed in BSTI approved brands have been incorporated with their average market rates. Rates of all the items of work prescribed in this PWD Schedule of Rates 2018 for Civil Works should be read and understood in conjunction with Analysis of PWD Schedule of Rates 2018 for Civil Works. Analysis of rates are based on study of price of various input such as material, labour, machine etc. of Dhaka, other metropolitan cities and district towns collected during the period of September 2017 to April 2018. Preparation of such document within a short span of time is a challenging task. In spite of every effort to make this document flawless, there might have inadvertent errors in various parts of the document. Notifying any such mistakes by the users would be highly appreciated. Moreover, PWD welcomes comments, suggestions and feedback from the users to improve this document in future. Manufacturers and dealers are also welcome to send details of materials approved by BSTI to be incorporated in the next version. The department expresses its gratitude to all who contributed directly or indirectly in preparing and publishing this new edition. Purta Bhaban Segun Bagicha, Dhaka Mohammad Rafiqul Islam Chief Engineer Public Works Department PREFACE 1.0 Analysis of PWD Schedule of Rates 2018 for Civil Works is the revised edition of Anaysis of PWD Schedule of Rates 2014 for Civil Works. 2.0 This Analysis of PWD Schedule of Rates 2018 for Civil Works incorporates most of the items with all corrections and will replace Anaysis of PWD Schedule of Rates 2014 for Civil Works. The nomenclature of many items has been improved by making it more generic and comprehensive. Items of Anaysis of PWD Schedule of Rates 2014 for Civil Works, which have become obsolete over a period of time or are not in use, have been dropped. 3.0 Items of some new and imported materials are included for better quality works with the demand of time. 4.0 This Analysis of PWD Schedule of Rates 2018 for Civil Works is based on the study of current market rates of materials at Dhaka and other metropolitan cities, district towns collected during the period of September 2017 to April 2018 and labour rates are the current market rates. 5.0 The following are the salient features of Analysis of PWD Schedule of Rates 2018 for Civil Works. 6.0 5.1 The description of items of works of this Analysis of PWD Schedule of Rates 2018 for Civil Works bears the adherence to PWD Book of Specification and Bangladesh National Building Code (BNBC). 5.2 Basic rates of relevant materials are provided for convenience of the user. 5.3 Generally, the basic rates of materials, incorporated in the schedule, are pertaining to materials conforming to Bangladesh Standards (BDS) and other international standards available in the market. A lot of effort has gone into the preparation of this Analysis of PWD Schedule of Rates 2018 for Civil Works. I convey my deep appreciation and sincere thanks to all the members and their associates involved in producing this Analysis of PWD Schedule of Rates 2018 for Civil Works. Purta Bhaban Segun Bagicha, Dhaka Md. Aminul Islam Khan Convenor PWD Schedule of Rates Committee & Additional Chief Engineer (P&SP) Public Works Department ANALYSIS OF PWD SCHEDULE OF RATES PREPARATION COMMITTEE Formed vide memo. no. 5 sh-12/14-1551, dated 14-09-2017 Sl. No. Name Designation and Office Status 1. Md. Aminul Islam Khan Additional Chief Engineer (P&SP), PWD, Dhaka Convenor 2. Md. Shahadat Hossain Additional Chief Engineer (Establishment & Co-ord.), PWD, Dhaka Member 3 Md. Abdul Hye Additional Chief Engineer, Dhaka Zone, PWD, Dhaka Member 4. Md. Salim Khan Additional Chief Engineer (Health Wing), PWD, Dhaka Member 5. Mohammad Abdul Majid Additional Chief Engineer, E/M Zone, PWD, Dhaka Member 6. Shahadat Hossain Deputy Chief Architect (Co-ord), Department of Architecture, Dhaka Member 7. Zafar Ahmed Superintending Engineer, E/M Circle-1, PWD, Dhaka Member 8. Md. Nurul Islam Superintending Engineer, E/M P&D Circle, PWD, Dhaka Member 9. Md. Nazibar Rahman Superintending Engineer, Savar Circle, PWD, Dhaka Member 10. S.M Zulkernine Superintending Engineer (Development), PWD, Dhaka Member 11. Md. Sohel Rahman Superintending Engineer, Design Circle-1, PWD, Dhaka Member 12. Md. Rafiqul Islam Superintending Engineer, Project Circle-2, PWD, Dhaka Member 13. Md. Jamilur Rahman Superintending Engineer, Project Circle-1, PWD, Dhaka Member 14. Kazi Md. Firoze Hassan Superintending Engineer, PECU Circle, PWD, Dhaka Member 15. Md. Syied Mahbub Morshed Superintending Engineer, Monitoring & Audit Circle, PWD, Dhaka Member 16. Abdur Razzaque Khan Executive Engineer, E/M P&D Division-2, PWD, Dhaka Member 17. Md. Shakhawat Hossain Executive Engineer, Design Division-5, PWD, Dhaka Member 18. SK. Md. Kudrot-E-Khuda Chief Arboriculturist, Arboriculture PWD Division, Dhaka Member 19. Rafia Begum Executive Engineer, E/M P&D Division-1, PWD, Dhaka Member 20. Md. Shamsul Islam Executive Engineer, Design Division-1, PWD, Dhaka Member 21. Nur-E-Kawonine Executive Engineer, Design Division-4, PWD, Dhaka Member 22. Zahid Hasan Khan Executive Engineer, PWD, Dhaka Member 23. Md. Maminul Haque Bhuiyan Chief Accounts Officer, PWD, Dhaka Member 24. Md. Emdadul Huq Executive Engineer, Design Division-2, PWD, Dhaka Associates Mohammad Ferdous-Uz-Zaman, Sub-Divisional Engineer, Design Division-2, PWD, Dhaka Md. Raquibul Hasan, Sub-Divisional Engineer, Design Division-2, PWD, Dhaka Md. Fateh Azam Khan, Assistant Engineer, Design Division-4, PWD, Dhaka Rajib Kanti Biswas, Assistant Engineer, Design Division-2, PWD, Dhaka Tariq Mahmud, Assistant Engineer, Design Division-1, PWD, Dhaka Member Secretary SPECIAL NOTE Utmost care has been taken to overcome mistakes and confusion etc. in description of items, units, rates although there may always be chances of unwilling printing mistakes. However, if confusion arises in the interpretation in any item/items, unit, rates etc. and if situation so demands, then the procuring entity must clarify and resolve the issue and approval is to be obtained in this regard from the competent authority (HOPE or his authorized representative). Hence the decision given by the competent authority will be treated as final. TABLE OF CONTENTS Sl. No Contents Page 1 Rates of man, materials and mark-ups 1-67 2 Secondary input for R. C. C. works 68-84 3 Division 1: General and site facilities 85-91 4 Division 2: Excavation, filling & site development and palisading 92-106 5 Division 3: Brick soling, CC, DPC etc. 107-111 6 Division 4: Brick works, patent stone in floor and fancy screen block works 112-132 7 Division 5: Mosaic works 133-146 8 Division 6: Tiles, marble stone and granite stone works 147-169 9 Division 7: Reinforced cement concrete (RCC) works 170-183 10 Division 8: M. S. fabrication and construction joint in RCC works 184-186 11 Division 9: Pile works and pile test 187-217 12 Division 10: Structural steel works, sheet roofing and safety canopy 218-226 13 Division 11: Wood works in door and window frame, roof truss and railings 227-234 14 Division 12: Door-window shutter & fly proof wire-net shutter 235-270 15 Division 13: Window grill, verandah grill & netting 271-280 16 Division 14: Aluminium door, window frame and glass works 281-349 17 Division 15: Cement plaster, fair-face plaster and pointing works 350-358 18 Division 16: Painting and polishing 359-365 19 Division 17: Lime terracing, roof top water proofing for garden and swimming pool 366-368 20 Division 18: False ceiling wall paneling 369-375 21 Division 19: Collapsible gate, M.S. gate, rolling shutter etc. 376-388 22 Division 20: Stair & verandah railing and stair nosing 389-401 23 Division 21: Grill fencing and barbed wire fencing 402-407 24 Division 22: Miscellaneous items 408-423 25 Division 23: Ferrocement works 424-428 26 Division 24: Road and pavement works 429-441 27 Division 25: Arboriculture works 442-448 28 Division 26: Sanitary & water supply works 449-565 29 Division 27: Deep tube-well 566-623 30 Division 28: Gas connection works 624-634 31 Division 29: Termite treatment works 635-637 32 Division 30: Concrete hollow block, facings and paving stone, non fire block 638-655 33 Division 31: Sub-soil investigation works 656-661 34 Division 32: Repair works 662-726 Analysis of PWD SoR 2018 for Civil Works 1 RATES OF MAN, MATERIAL AND MARK-UPS SL Items Rate Unit 1 MARK-UPS 1 Contractor's Profit 2 Contractor's Overhead Expenses 3.50% 3 VAT 6.00% 4 Additional Incidental Expenses for Gas Line Installation Works C1 10.00% 10.00% LABOUR & MAN-POWER: PER DAY 1 Head mason / Mosaic head mistry Tk. 600.00 per day 2 Mason Tk. 500.00 per day 3 Skilled labour Tk. 390.00 per day 4 Ordinary labour Tk. 320.00 per day 5 Field Engineer (minimum BSc in Eng. with 3yrs exp or Diploma in Eng. with 8yrs exp) Tk. 1,800.00 per day 6 Skilled technician Tk. 1,000.00 per day 7 Semi skilled technician Tk. 600.00 per day 8 Foreman/Supervisor Tk. 800.00 per day 9 Electrician Tk. 600.00 per day 10 Assistant Electrician Tk. 500.00 per day 11 Rod binder Tk. 500.00 per day 12 Mosaic mistry Tk. 500.00 per day 13 Plumber Tk. 600.00 per day 14 Painter Tk. 600.00 per day 15 Carpenter Tk. 600.00 per day 16 Welder Tk. 600.00 per day 17 Polish mistry Tk. 600.00 per day 18 Helper to carpenter/painter/plumber/rod binder/electrician/polish mistry/rig operator Tk. 390.00 per day 19 Machine operator Tk. 600.00 per day 20 Pile rig operator Tk. 600.00 per day 21 Diesel hammer mounted rig operator Tk. 800.00 per day Analysis of PWD SoR 2018 for Civil Works SL 2 Items Rate Unit 22 Helper to diesel hammer mounted rig operator Tk. 390.00 per day 23 Rig operator including site allowances for soil exploration Tk. 600.00 per day 24 Assistant laboratory technician Tk. 800.00 per day 25 Laboratory technician (Diploma in engg in relevant field having minimum 3yrs exp) Tk. 1,400.00 per day 26 Laboratory engineer (minimum BSc in relevant field with minimum 3yrs exp) Tk. 1,800.00 per day 27 Ghorami Tk. 500.00 per day 28 Sweeper for ODD JOB Tk. 800.00 per use 29 Tube-well mistry Tk. 500.00 per day 30 Tube-well head mistry Tk. 600.00 per day 31 Surveyor (10yrs Exp / diploma Engineer trained in survey) Tk. 1,400.00 per day 32 Helper to surveyor Tk. 800.00 per day C2 EQUIPMENT, TOOLS & PLANTS, VEHICLE, SCAFFOLDING ETC. 33 Scaffolding Tk. 9.00 per sft 34 Carrying charge of earth by 5-ton capacity truck in Dhaka city Tk. 1,700.00 per trip 35 Carrying charge of earth by 5-ton capacity truck in Narayanganj / Chittagong / Sylhet city Tk. 1,200.00 per trip 36 Carrying charge of earth by 5-ton capacity truck in Rajshahi / Barisal / Khulna metropolitan area Tk. 950.00 per trip 37 Carrying charge of earth by 5-ton capacity truck in all district except Dhaka/ Chittagong/ Rajshahi / Barisal / Khulna and Narayangonj city Tk. 800.00 per trip 38 Carriage of earth by any means for site development in Dhaka city Tk. 7.50 cft 39 Carriage of earth by any means for site development in Narayanganj / Chittagong / Sylhet city Tk. 6.00 cft 40 Carriage of earth by any means for site development in Rajshahi / Barisal / Khulna city Tk. 5.50 cft 41 Carriage of earth by any means for site development in in all district except Dhaka, Chittagong, and Narayangonj city Tk. 4.50 cft 42 5-ton capacity truck-fare in Dhaka city including loading & unloading Tk. 1,700.00 per trip 43 Hire charge of concrete mixer machine Tk. 1,200.00 per day 44 Hire charge of concrete vibrator Tk. 600.00 per day 45 Hire charge of water pump for concreting or similar purposes Tk. 500.00 per day 46 Hire charge of diesel operated 1/4 cusec capacity water pump Tk. 600.00 per day Analysis of PWD SoR 2018 for Civil Works SL 3 Items Rate Unit 47 Hire charge of electricity operated 1 cusec capacity water pump Tk. 800.00 per day 48 Hire charge of 1 cusec capacity diesel operated water pump Tk. 1,200.00 per day 49 Fuel & lubricant for mixer machine, vibrator, pump etc. Tk. 1,200.00 per day 50 Hire charge of mosaic cutting machine Tk. 400.00 per day 51 Hire charge of marble cutting and shaping machine including cutting disc. Tk. 400.00 per day 52 Hire charge of marble polishing machine including polishing stone Tk. 550.00 per day 53 Hire charge of marble cutting disk Tk. 400.00 per day 54 Hire charge of electric grinding machine Tk. 260.00 per day 55 Hire charge of cast in situ pile boring complete rig set including operational expenses Tk. 6,000.00 per day 56 Hire charge of pre-cast pile driving complete rig set including operational expenses Tk. 5,500.00 per day 57 Hire charge of pre-cast micro pile driving complete rig set including operational expenses Tk. 4,000.00 per day 58 Hire charge of load testing devices including hydraulic fluid: up to 200 ton capacity Tk. 6,000.00 per test 59 Hire charge of pile load testing devices including hydraulic fluid: up to 400 ton capacity Tk. 8,000.00 per test 60 Hire charge of diesel hammer mounted completed rig set. Tk. 24,000.00 per day 61 Hire charge of auger boring complete rig set including operational expenses Tk. 75,000.00 per day 62 Hire charge of crane for auger boring Tk. 50,000.00 per day 63 Hire charge of air compressor for auger boring Tk. 5,000.00 per day 64 Hire charge of concreting equipment for auger boring Tk. 5,000.00 per day 65 Hire charge of generator for auger boring Tk. 5,000.00 per day 66 Hire charge of excavator for auger boring Tk. 10,000.00 per day 67 Hire charge of desander for auger boring Tk. 6,000.00 per day 68 Hire charge of mud silo for auger boring Tk. 1,000.00 per day 69 Hire charge of water bowser for auger boring Tk. 5,000.00 per day 70 Hire charge of hydraulic static pile driver complete rig set Tk. 75,000.00 per day 71 Generator, fuel, lubricant for hydraulic static pile driver Tk. 20,000.00 per day 72 Hire charge of 3HP mud pump Tk. 600.00 per day 73 Hire charge of MS steel tank (6'-6" x 10'-0" x 4'-0") Tk. 350.00 per trip 74 Truck fare for carrying diesel hammer mounted rig Tk. 15,000.00 per trip Analysis of PWD SoR 2018 for Civil Works SL Items 4 Rate Unit 75 Hire charge of 8 - 12 ton road roller Tk. 5,500.00 per day 76 Hire charge of vibratory (ride on) roller with 2 steel drum compactor (3-5 tons) Tk. 5,000.00 per day 77 Hire charge of pneumatic multiple tired roller (7 tires, 8-10 tons) Tk. 5,000.00 per day 78 Hire charge of asphalt plant Tk. 15,000.00 per day 79 Hire charge of AC paver Tk. 6,000.00 per day 80 Hire charge of dump truck/ tripping trucks Tk. 5,000.00 per day 81 Hire charge of distributor Tk. 5,500.00 per day 82 Hire charge of water tanker (truck mounted) Tk. 3,000.00 per day 83 Hire-charge of chain dozer Tk. 7,500.00 per day 84 Fuel & lubricants, spares, maintenance, driver etc. for 8-12 ton road roller. Tk. 1,300.00 per day 85 Hire charge of paint spray machine Tk. 650.00 per day 86 Hire charge of machine for cutting terrazzo tiles Tk. 500.00 per % sft 87 Chisel for heavy duty power hammer (100 sft capacity) Tk. 1,700.00 88 Hire charge of heavy duty chisel machine Tk. 650.00 per day 89 Shuttering including prop for partial dismantling of R.C.C. Tk. 27.00 per sft 90 Hire charge of welding machine Tk. 700.00 per day 91 Hire charge of survey instrument (Level / Theodolite etc.) Tk. 950.00 per day C3 WORK RATE EXCLUDING COST OF MATERIALS 92 Breaking of 50 mm down brick chips Tk. 850.00 per % cft 93 Breaking of 20 mm down brick chips Tk. 950.00 per % cft 94 Breaking of 12 mm (1/2") down brick chips Tk. 1,200.00 per % cft 95 Breaking of 20 mm down stone chips Tk. 2,000.00 per % cft 96 Breaking of 12 mm down stone chips Tk. 2,200.00 per % cft 97 Placing and removing of shutter for formwork Tk. 15.00 per sft 98 Making steel shutter for formwork Tk. 75.00 per sft 99 Making steel door-window frame and shutter Tk. 65.00 per sft 100 Making fixed steel glazed frame Tk. 55.00 per sft 101 Making steel grill Tk. 45.00 per sft each Analysis of PWD SoR 2018 for Civil Works SL 5 Items Rate Unit 102 Filling and stitching gunny bags Tk. 10.00 per bag 103 Load testing result sheet preparation Tk. 6,000.00 per test 104 Carrying cost of timber Tk. 40.00 per cft 105 Seasoning of timber in plant Tk. 150.00 per cft 106 Carrying cost of steel door and window Tk. 70.00 each 107 Fabrication and erection of mild steel truss Tk. 2,100.00 per 50 kg 108 Fabrication of light section steel Tk. 300.00 per 50 kg C4 WORK RATE INCLUDING COST OF MATERIALS 109 Point welding Tk. 2.50 per point 110 Line welding (at field) Tk. 6.00 per inch 111 Bitumenous coating (for damp proof course (D.P.C)) Tk. 800.00 per % sft 112 Coal-tar (over timber surface) Tk. 7.00 per sft 113 Glass pan fitting including putty Tk. 16.00 per sft 114 Jute hessian (for making formwork water-tight) Tk. 2.50 per sft C5 BRICKS AND SCREEN BLOCKS 115 1st class/Picked jhama standard bricks Tk. 8,700.00 per % 0 nos 116 Automatic machine made 1st class standard bricks Tk. 9,...
View Full Document

  • Summer '19
  • Tk., civil works, 6 mm caliber, Pistol and rifle cartridges, 9 mm caliber

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes