Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same places, e.g. 15.25 and final answers to O decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $83,000 $63,150 Direct labor 50,000 140,000 Manufacturing overhead applied 42,500 (d) Total manufacturing costs 145,650 213,000 Work in process 1/1/20 (b) 15,500 18,000 Total cost of work in process 201,500 Work in process 12/31/20 11,800 Cost of goods manufactured