com part power pt

com part power pt - • Total Cost = 10,000 + 29,600x...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Click to edit Master subtitle style 2/10/10 Access Control v Security Guard Station Automated Non-automated
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2/10/10 Security Guard Station 6’x4’ Tempered Safety Glass Traffic Controlling Arm $10,000 installation
Background image of page 2
2/10/10 Manual Security Guard Controlled Shack Installation Cost – $10,000 Guard Salary – $29,600 per year
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: • Total Cost = 10,000 + 29,600x 2/10/10 Automation • Controlled by Keypad • Shack Installation Cost – $10,000 • Automation Installation Cost – $1,000 • Yearly Automation Maintenance – $500 • Total Cost = 11,000 + 500x 2/10/10 Cost Comparison 2/10/10 Temporary Office Space...
View Full Document

This note was uploaded on 02/05/2010 for the course WRIT 20091 taught by Professor Ramsey during the Spring '09 term at USC.

Page1 / 6

com part power pt - • Total Cost = 10,000 + 29,600x...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online