E10-ModuleB-CEE-Lab3Th data

E10-ModuleB-CEE-Lab3Th data - E10 CEE Module Fall 2009...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
E10 CEE Module Fall 2009 Tuesday section (Rabia Chaudhry) 1.28 152.2 99.6 0.35 170.1 156 1.65 143.3 73.4 0.9 161.2 125.4 1.4 150.5 92.9 Temperature (not needed for calculatio24 deg C D=9.5mm Flowrate (m^3/s) Speed of water v (m/s) 0 1.14 0 0.31 0 1.47 0 0.8 0 1.24 Flowrate  (gpm) Piezometer 1  average (cm) Piezometer 2  average (cm) -0.6 -0.5 -0.4 -0.3 -0.2 -0.1 0 0.1 0.2 0.3 -1 -0.8 -0.6 -0.4 -0.2 0 f(x) = 1.03x - 0.34 R² = 1 Column M Linear Re- gression for Column M log(v) log(h) Δ
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Pipe #1 A =7.09E-05 m^2 log(v) Headloss (Δh) log (Δh) 0.06 0.53 -0.28 -0.51 0.14 -0.85 0.17 0.7 -0.16 -0.1 0.36 -0.45 0.09 0.58 -0.24
Background image of page 2
E10 CEE Module Fall 2009 Wed section (Kayla Patten) Pipe #2 log(v) log (Δh) 0.56 172.6 170.8 0 0.19 -0.72 0.02 -1.74 1.02 171.4 166.2 0 0.35 -0.46 0.05 -1.28 2.02 165.2 153.4 0 0.69 -0.16 0.12 -0.93 3.24 149.8 123.4 0 1.11 0.05 0.26 -0.58 4.02 138.5 101.8 0 1.38 0.14 0.37 -0.44 5.05 121.7 70.2 0 1.73 0.24 0.52 -0.29 Internal Diameter of Pipe  (mm) 15.3 Cross section area (m^2)
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/09/2010 for the course ENGIN 10 taught by Professor Johnson during the Fall '08 term at Berkeley.

Page1 / 4

E10-ModuleB-CEE-Lab3Th data - E10 CEE Module Fall 2009...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online