FAP_module1_spreadsheet.xls - OPERATION Mountain Mining...

This preview shows page 1 - 2 out of 52 pages.

OPERATION: Mountain Mining Canada Limited - South Face Mine - All in Canadian Dollars unless otherwise specified Direct/IndirectMajor CategoryMinor CategoryDescriptionFAS?Direct1.0) Roads, Railroads, AirstripsHaul RoadsNo large equipment haul roads to recoverNoDirect1.0) Roads, Railroads, AirstripsAsphalt RoadsMain access road from Main Hwy including pavement at plant site to remainNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsBackfill Quarry Access Road - required for monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsSilver Dam Road - required for inspection and monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsIron Creek Access Road - alternate entry for inspection and monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsCopper Lake Access Roads - to remain for inspection and monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsRuby Lake, Emerald Pond and Diamond Creek Flow Station roads to remain for monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsLandfill Access Road - to remain for inspection/monitoringNoDirect1.0) Roads, Railroads, AirstripsEarth RoadsOnyx pit road to be ripped and reclaimed up to Mica Diversion Canal/CulvertNoDirect2.0) Drill Sites, Drill Pads, Exploration TrenchesDrill Sites, DrillAll surface exploration drill sites, pad, trenches closed-out during operationsNoDirect3.0) Drill Hole AbandonmentMining Drill HoleMining related drill holes that pose safety hazard to be grouted - part of item 11.1.1NoDirect3.0) Drill Hole AbandonmentGroundwater DrilGroundwater monitoring wells to meet environmental regulation specs after monitoring ceasesNoDirect4.0) Pits, Borrow Areas & TrenchesPitsFill backfill quarry with waste rock during operations, flood and berm with bouldersNoDirect4.0) Pits, Borrow Areas & TrenchesPitsOnyx pit transferred to Valley Mine Management CorporationNoDirect4.0) Pits, Borrow Areas & TrenchesBorrow AreasAll borrow areas to be reclaimed during operationsNoDirect4.0) Pits, Borrow Areas & TrenchesTrenchesAll trenches to be reclaimed during operationsNoDirect4.1) Portals/Adits Underground MinesPortals/Adits UnCapping of main shaft and ventilation/backfill raises - 6 caps in total included in item 11.1.1NoDirect5.0) Non-Process Ponds & ReservoirsPondsPlant site sedimentation Pond - natural wetland developmentNoDirect5.0) Non-Process Ponds & ReservoirsReservoirsOpal Lake dam mitigation/close-out not resolved yetNoDirect6.0) Water Treatment6.1) Water TreatNo heap leach padsNoDirect6.0) Water Treatment6.2) Water TreatOne flooded backfill quarry with acceptable water quality and no surficial discharge NoDirect6.0) Water Treatment6.3) Water TreaAll waste dumps removed to backfill quarry during operations - charged to operationsNoDirect6.0) Water Treatment6.4) Water TreatmTreatment of 197,000 m3 of tailings pond water and 207,000 m3 GCP seepage using Garnet PlantYesDirect6.0) Water Treatment6.4) Water TreatmOperations and maintenance for above treatment periodYesDirect6.0) Water Treatment6.4) Water Treatm

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture