    Site and Equipment Review Construction / Crane Review
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Notes for the week Today – Review Construction Process Today – Discuss Cranes Turnit-in Posted to Class Website  (lss.at.ufl.edu)
Background image of page 2
    Construction Team Owner perceived good investment At minimum Owner needs – Appropriate funds Suitable site Architect is responsible for contract  documents. Contractor is responsible for construction. Any omissions to contract documents considered  extra to contract.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    Suitable Site Tested by ‘Geotechnical experts’ Amount of testing depends on – Size and complexity of job Type of soil encountered – bad results in  more testing to confirm boundaries Groundwater level
Background image of page 4
  Basic Units of Measure Volume  Length x Width x Depth (in same units) How much is a cubic yard? 20 ft x 10 ft x 0.5 ft / 27 = 3.7 cu yards
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 54

Cranes_spring08 - SiteandEquipmentReview...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online