Outline Specifications

Outline Specifications - ToddStahoviak Dr.Evans ARET276...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Todd Stahoviak Dr. Evans ARET 276 3 March 09        Outline Specifications Division 2 Site Construction-   02230 Site Clearing , clearing of plants, grass, rocks, and debris,  and also protection of existing trees around the site;  02300 Earthwork , site preparation;  02530 Sanitary  Sewerage System , new sanitary lines for restrooms leading to existing lines;  02551 Site Gas Distribution new natural gas service lines to building from on-site gas main;  02741 Asphaltic Concrete Paving , parking  lot and driveway are asphaltic concrete;  02751 Portland Cement Concrete Paving , sidewalks are 4” thick;  02765 Pavement Marking , lines in the parking lot will be painted, handicap spot, and no parking zone;  02810 Landscape Irrigation System , new system to water the plants and trees;  hydroseeding of turf areas;  02950 Landscape Planting , new trees and shrubs around parking lot and  building Division 3 Concrete-   03300 Cast-In-Place Concrete , 6” concrete slab,  03200 Concrete Reinforcement
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/15/2010 for the course K k taught by Professor K during the Spring '10 term at Purdue University Calumet.

Page1 / 2

Outline Specifications - ToddStahoviak Dr.Evans ARET276...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online