CAPACITY_PLANNING_FIN

CAPACITY_PLANNING_FI - ANJOCA CORPORATION CAPACITY PLANNING TOOL V Start CA CORPORATION PLANNING TOOL V 2 Exit CAPACITY ProductC WC 100 200 300

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
ANJOCA CO CAPACITY PLAN Start
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
RPORATION NNING TOOL V. 2 Exit
Background image of page 2
CAPACITY: Product C Err:509 Required Capacity, hr WC 1 2 3 4 5 6 7 8 Product 100 0 0 0 0 0 0 0 0 A 200 69 103 138 163 189 206 86 43 B 300 14 22 29 34 40 43 18 9 C Total 83 125 166 198 229 250 104 51 March-09 WC 1 2 3 4 5 6 7 8 WC 100 160 160 160 160 160 240 66 100 100 200 91 57 22 -3 -29 34 -9 117 200 300 146 138 131 126 120 277 70 21 300 All Products Product A Product B Product C Capacity, hr Change Capacity Item Edit MPS Roll Forward Workplan
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
MPS Period 1 2 3 4 5 6 7 8 Err:509Err:509Err:509Err:509Err:509Err:509Err:509Err:509 Err:509Err:509Err:509Err:509Err:509Err:509Err:509Err:509 Err:509Err:509Err:509Err:509Err:509Err:509Err:509Err:509 WORKPLAN Period 1 2 3 4 5 6 7 8 160 160 160 160 160 240 66 100 160 160 160 160 160 240 77 160 160 160 160 160 160 320 88 30 Return to Start Menu
Background image of page 4
CAPACITY PLANNING WORKSHEET ANJOCA CORPORATION ALL  PRODUCTS Required Capacity, hr Workcenter 1 2 3 4 5 6 7 8 100 ### ### ### ### ### ### ### ### 200 ### ### ### ### ### ### ### ### 300
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/16/2010 for the course ISE 3024 at Virginia Tech.

Page1 / 12

CAPACITY_PLANNING_FI - ANJOCA CORPORATION CAPACITY PLANNING TOOL V Start CA CORPORATION PLANNING TOOL V 2 Exit CAPACITY ProductC WC 100 200 300

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online