Table of Contents and Visual Aids

Table of Contents and Visual Aids - iv. Table of Contents...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: iv. Table of Contents Subsections Abstract ii. Table of Contents iii. Visual Aids iv. Executive Summary v. Sections Problem Statement 1 Research Assessment 3 Technical Plan with Cost Analysis 6 Evaluation Plan 14 Works Cited 16 iii. Visual Aids Pg 3 Runoff Comparison chart Pg 4 Rooftop Temperature Comparison Chart iv. Pg. 7 Tentative Installation schedule Action taken Time to completion Landscape design- Analysis of roofs dimension- Draft and design suggestions two weeks (depending on customers request) Structural analysis- Operations design- Irrigation and drainage systems design- Structural repair recommendations 2 months Irrigation and drainage system- Installation of irrigation and drainage system- Test of systems 1 month Installation- Transportation of materials- Evaluation of membranes- Elevation to roof- Placement according to landscape design 1 month iv. Pg. 9 Cost Analysis Component Costs Cost Factors Design & Specifications 5 - 10 % (of total roofing cost) The size/complexity of the...
View Full Document

Page1 / 6

Table of Contents and Visual Aids - iv. Table of Contents...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online