IEOR_Module_Lab1_Assignment-1 - University of California at...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
University of California at Berkeley Engineering 10 Spring 2010 Professor Leachman Optimization Part  Lab #1 Assignment Due in Evan Davidson’s mailbox on the 4 th floor of Etcheverry Hall at 5:30 PM on Thursday, Feb 11. Please show work and attach pages if necessary. Name ___________________ Date ___________________________ 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
University of California at Berkeley Engineering 10 Spring 2010 Professor Leachman Exercise 1: The International Global Mega Corporation has to connect 19 cities with high speed computer lines. It is possible to lease a line between each pair of the sites, but the leasing cost varies widely between pairs of sites. In order for IGMC to connect all cities, it is only necessary for there to be an unbroken indirect path between any pair of sites. The table below lists the leasing costs of lines between each possible pair of cities, in thousands of dollars per month. Which lines
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/19/2010 for the course ENGINEERIN 72826 taught by Professor Sengupta/leachman/johnson during the Spring '10 term at University of California, Berkeley.

Page1 / 4

IEOR_Module_Lab1_Assignment-1 - University of California at...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online