minitab project 5

minitab project 5 - (492.25-3x4.75, 497+3x4.75) = (478,...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Minitab Project 5 1.) The current supplier IQR is spread over a much larger range than the alternative supplier. The current supplier box plot is skewed to the right 2.) C1 (494-1.5x14.25, 508.25+1.5x14.25) = (472.625, 529.625) (494-3x14.25, 508.25+3x14.25) = (451.25, 551) C2 (492.25-1.5x4.25, 497+1.5x4.75) = (485.875, 504.125)
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (492.25-3x4.75, 497+3x4.75) = (478, 511.25) 3.) (minitab) The main differences among the plots are median and IQR between both box plots. The main similarity is the median whereas the IQR is the main difference....
View Full Document

This note was uploaded on 02/23/2010 for the course BUAD 310 at USC.

Ask a homework question - tutors are online