crash calculations

crash calculations - 2.00 1 $40.00 g d,e 7 4 $50.00 $230.00...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Deadline 17 Total Cost  $650.00  Activity Precedence a 6 5  $60.00   $90.00   $30.00   1.00  1  $30.00  b 7 4  $50.00   $150.00   $33.33   3.00  0  $-    c a 6 4  $100.00   $160.00   $30.00   2.00  2  $60.00  d a 7 7  $30.00   $30.00   NA   -    0  NA  e b 5 4  $70.00   $85.00   $15.00   1.00  0  $-    f c 9 7  $40.00   $120.00   $40.00 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 2.00 1 $40.00 g d,e 7 4 $50.00 $230.00 $60.00 3.00 2 $120.00 Total $400.00 $250.00 Node 2 5 3 7 4 9 5 12 6 17 Normal Duration Crash Duration Normal Cost Crash Cost Cost per Day Maximum Crash Amt. Amount to Crash Crashing Cost 5 7 4 7 5 8 5 Actual Time...
View Full Document

This note was uploaded on 02/23/2010 for the course ENGR IE 3310 taught by Professor Dr.jesusjimenez during the Spring '09 term at Texas State.

Page1 / 2

crash calculations - 2.00 1 $40.00 g d,e 7 4 $50.00 $230.00...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online