Statement of Work for PP

Statement of Work for PP - Nicole Eveleigh IE 3310 February...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Eveleigh IE 3310 February 11, 2009 Statement of Work I. INTRODUCTION A. Purpose The purpose of this Statement of Work ("SOW") is to set forth the requirements to design and systematically plan a facility that is capable of efficiently producing Valve-Regulated Lead Acid (VRLA) batteries. B. Description of Action 1. Respondent will design and systematically plan a facility that is efficient in producing Valve-Regulated Lead Acid (VRLA) batteries. 2. Respondent will provide a Site Location. 3. Respondent will provide Space Requirements (machines / departments). 4. Respondent will provide Layout Alternatives and Evaluation of Layout Alternatives. 5. Respondent will provide Activities Area and Features Sheets, and Parking Lot Design. 6. Respondent will provide a 2-D & 3-D Facility Layout (w/ process flow & storage areas). 7. Respondent will provide Material Handling Equipment List, Initial Investment 8. Respondent will construct access roads, staging areas, work pads, and other infrastructure as necessary to accomplish the required design and layout of the facility, parking, and associated activities. 8.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

Statement of Work for PP - Nicole Eveleigh IE 3310 February...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online