Q1 - ARENA Simulation Results Sorawit License STUDENT Summary for Replication 1 of 1 Project Question 1 HW3 Run execution date Analyst Sorawit

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Sheet1 Page 1 ARENA Simulation Results Sorawit - License: STUDENT Summary for Replication 1 of 1 Project: Question 1 HW3 Run execution date : 2/28/2010 Analyst: Sorawit Model revision date: 2/28/2010 Replication ended at time : 8.0 Hours Base Time Units: Hours TALLY VARIABLES Identifier Average Half Width Minimum Maximum Observations _________________________________________________________________________________________________ phone.VATime 1.3546 (Insuf) .14110 5.9372 13 phone.NVATime .00000 (Insuf) .00000 .00000 13 phone.WaitTime .73070 (Insuf) .00000 2.0873 13 phone.TranTime .00000 (Insuf) .00000 .00000 13 phone.OtherTime .00000 (Insuf) .00000 .00000 13 phone.TotalTime 2.0853 (Insuf) .14110 5.9372 13 account department.Queue.WaitingTime .99726 (Insuf) .00000 2.0873 7 CS1.Queue.WaitingTime .56209 (Insuf) .00000 1.1278 3 CS2.Queue.WaitingTime .61260 (Insuf) .00000 .96878 3 CS3.Queue.WaitingTime .00000 (Insuf) .00000 .00000 3 DISCRETE-CHANGE VARIABLES Identifier Average Half Width Minimum
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/01/2010 for the course EEE ddsds taught by Professor Saa during the Spring '10 term at Abraham Baldwin Agricultural College.

Page1 / 4

Q1 - ARENA Simulation Results Sorawit License STUDENT Summary for Replication 1 of 1 Project Question 1 HW3 Run execution date Analyst Sorawit

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online