311_Session5

311_Session5 - OperationsManagement...

Info iconThis preview shows pages 1–16. Sign up to view the full content.

View Full Document Right Arrow Icon
Operations Management Session 5:  Linear Programming
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 2 Previous Class Kristen Cookie Capacity Planning
Background image of page 2
Session 5 Operations Management 3 Today’s Class Understand what a Linear Program is. Understand how to solve small LP’s graphically. Practice LP formulation
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 4 What to produce? A computer manufacturer produces 2 types of  computers HS (High Speed) and LS (Low Speed).  The profit margin for HS computer is $100 per unit  and for LS computer is $75 per unit.  One assembling machine is used for both models.  The machine operates 600 minutes a day. A HS  unit needs 30 minutes, and A LS unit needs 10  minutes. 
Background image of page 4
Session 5 Operations Management 5 What to produce? One testing machine is also used for both models. The machine operates 600 minutes a day. A HS unit needs 10 minutes and A LS unit needs  20 minutes. 
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 6 What to produce? We also need a packaging machine.  The machine operates 600 min a day.  Every single product needs 20 min for packing.  
Background image of page 6
Session 5 Operations Management 7 Solve Graphically LS HS 40 30 15 20 5 5 100*HS+75*LS = C (5,5) C=3000 C=1500
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 8 Solve Graphically LS HS 40 30 15 20 100*HS+75*LS = C 20 60 30*HS+10*LS = 600
Background image of page 8
Session 5 Operations Management 9 Solve Graphically LS HS 40 30 15 20 100*HS+75*LS = C 20 60 30*HS+10*LS = 600 10*HS+20*LS = 600 (24,12) 30
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 10 Solve Graphically LS HS 40 30 15 20 100*HS+75*LS = C 20 60 30*HS+10*LS = 600 10*HS+20*LS = 600 20*HS+20*LS = 600 (15,15) 30
Background image of page 10
Session 5 Operations Management 11 What to produce? x = # LS to produce; y = # HS to produce Maximize profit:  100y + 75x Assembly machine constraint: 30y + 10x <= 600 Testing machine constraint: 10y + 20x <= 600 Packaging machine constraint: 20y + 20x <= 600
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 12 Another Production Example A toy company offers 2 different dolls: Beauty and  Beast.  The daily demand for each doll is 400  units. There are two types of machines. Everyday, M1  can make 10 units of Beauty and 2 units of Beast;   M2 can make 3 units of Beauty and 7 units of  Beast.
Background image of page 12
Session 5 Operations Management 13 Another Production Example M1 costs $7 K and M2 costs $5 K. How many units of M1 and M2 should the  company purchase?
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Session 5 Operations Management 14 Another Production Example Demand                           Question      10 2 M1 3 7 M2 7 5 400 400 ? ?
Background image of page 14
Session 5 Operations Management 15 Another Production Example What should be the objective of the toy company?
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 16
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 48

311_Session5 - OperationsManagement...

This preview shows document pages 1 - 16. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online