11 quiz - 1. 1MC1

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
1. 1MC1   The following occurs as a result of Project-based learning, except for:    Student Response Value Correct Answer Feedback 1.  Almost all aspects of  the student’s  experience changes      2. Real time  connections between  learners and expert       3. Student behavior  changes      4. Teacher is the content  expert 100%       Score: 2/2    2. 1TF2   The transition to Project-based learning comes very easily for most teachers.  Student Response True  Score: 0/2    3. 1TF1   Project-based learning, powered by modern technologies, is a strategy certain to turn traditional classrooms  upside down. 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Student Response True  Score: 2/2    4. 1TF3   After duration of time passes, student will get better at working individually, managing deadlines, resolving  conflict, and investigating their own questions.  Student Response False  Score: 2/2    5. 1MC3   You will need to reconsider the following when using the project approach: 
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/10/2010 for the course ED 4070 taught by Professor Sweet during the Fall '09 term at Western Michigan.

Page1 / 4

11 quiz - 1. 1MC1

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online