ITP320_Project3

ITP320_Project3 - ITP 320 Project#3 Purchasing Cycle Answer...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
ITP 320 Project #3 – Purchasing Cycle Answer Sheet Turn in only this answer sheet on blackboard.usc.edu Student Name: Data Set Number Score (45) 1 point each except as noted 1. What is the vendor number? 0000100322 2. What is the system message? Material UB- 0010-24 created 3. What is the system message? Material UB- 0011-24 created 4. What is the system message The material already exists and will be extended 5. What is the main difference between the material master for distribution channels WH and IN? The main difference was in the condition settings (amount.) For the Internet Distribution channel, we entered scale quantity 1 and amount 70, where in the Wholesale , we had higher values for the amount of 110 for quantity 1. 6. What is the current available quantity? 0 7. What exception has been posted? 96
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
8. What is the purchase requisition number? 0010000023 9. What is new in this list as compared to section 4? The
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/14/2010 for the course ITP 320 taught by Professor Kale during the Fall '08 term at USC.

Page1 / 4

ITP320_Project3 - ITP 320 Project#3 Purchasing Cycle Answer...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online