ITP320_Project4

ITP320_Project4 - ITP 320 Project #4 Production Planning...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ITP 320 Project #4 Production Planning and Execution Answer Sheet Student Name: ## Number Score (45) 1 point each except as noted Because in the previous step we only completed the Forecasting part, and now we have to enter data for all other fields: Basic Data, Sales, MRP(s), etc... 1. Why are you creating this material again? 2. What are the Component Descriptions of each of the components? SF-0010-24 Front Wheel SF-0010-24 Front Wheel SF-0020-24 Rear Wheel SF-0020-24 Rear Wheel SF-0030-24 Saddle SF-0030-24 Saddle SF-0050-24 Handle Bar SF-0050-24 Handle Bar RM-0170-24 Frame - Ridge RM-0180-24 Frame - Terrain RM-0150-24 Pedal RM-0150-24 Pedal RM-0160-24 Break Kit RM-0160-24 Break Kit 3. Search for a graphic of the Routing (look in the menu bar) and insert a screen shot. 4. Search for a graphic of the Routing (look in the menu bar) and insert a screen shot. 5. Is the Production level same as the Sales level? ____ Yes _____ Why? __ Because we chose the Synchronous to Sales model so it synchronized Sales with Production 6. What formula was used to calculate the Production level? (2) Production = Current Target Stock level + Sales - Previous stock level 7. What is the Production level for the first five months?...
View Full Document

Page1 / 13

ITP320_Project4 - ITP 320 Project #4 Production Planning...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online