hw9_solution

hw9_solution - Homework 8 Solution (40 points total, 10...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1. 15.6 on SEEcon Book, (If assume weight of 0.15 for energy savings and safety, 0.05 for accounting and savings analysis, and 0.10 for the rest) Weighted Sum Analysis: ---2 points If using this rating scale: outstanding 10 very good 9 good 7 adequate 5 margin 3 poor 1 none 0 We will get: ---4 points Criteria Energy, Inc. Micro Controls Econetics Steady-state energy savings 10%*15 = 150 8%*15 = 120 12%*15 = 180 Controls 5*10 = 50 9*10 = 90 3*10 = 30 Ease of operation 5*10 = 50 7*10 = 70 5*10 = 50 Diagnostics 5*10 = 50 7*10 = 70 1*10 = 10 Availability 0.990*10 = 9.9 0.995*10 = 9.95 0.975*10 = 9.75 Growth/update capability 5*10 = 50 7*10 = 70 5*10 = 50 Safety features 9*15 = 135 7*15 = 105 5*15 = 75 Accounting system 7*5 = 35 7*5 = 35 9*5 = 45 Vendor reliability, support 9*10 = 90 7*10 = 70 5*10 = 50 Savings analysis package 7*5 = 35 0 * 5 = 0 0 * 5 = 0 Total 645+9.9 = 654.9 630+9.95=639.95 490+9.75=499.75 Based on the weighted sum analysis, Energy, Inc. seems to provide the best solution. Note : student may assign weight to availability or not to, either way should be ok. You could also assign other weights, like all the weights are equal. DSC Analysis: ---4 points For DSC, the rating scale should be reduced to be between 0.0 to 1.0. Criteria
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/15/2010 for the course CSCI 510 at USC.

Page1 / 4

hw9_solution - Homework 8 Solution (40 points total, 10...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online