Monet - Constraints Resources Used Avail Labor 4000<=...

Info icon This preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Inputs Frame A Frame BFrame CFrame DMax amount Labor 2 1 3 2 4000 Metal 4 2 1 2 6000 Glass 6 2 1 2 10000 Profit contribution $6.00 $2.00 $4.00 $3.00 Maximal production 1000 2000 500 1000 Changing cells Frame type A B C D Amount produced 1000 800 400 0 Objective function Profit $9,200.00
Image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Constraints Resources Used Avail Labor 4000 <= 4000 Metal 6000 <= 6000 Glass 8000 <= 10000 Maximal productio Produced Demand Frame A 1000 <= 1000 Frame B 800 <= 2000 Frame C 400 <= 500 Frame D 0 <= 1000...
View Full Document

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern