are157-homework-4

are157-homework-4 - A RE 157 ~.RU-tZO(O M.Whitney ANALYSIS...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ARE 157 ~.RU-tZO(O M.Whitney ANALYSIS FOR PRODUCTION MANAGEMENT Homework 4 ~. JYlOAcit llb 'l<\ d~'\~~ Ccf~ to $UJ.~ ~ f. \ (20) 1. Champion Rubber Products manufactures garden hoses. Its master production schedule is as follows: Week Item 6 7 8 9 10 50' hQse 800 1000 1400 75' hose 400 500 600 100' hose 1100 1200 The bill ofrnaterials for the 50 foot hose is: ' " Item Description 0001 50' hose 10,01 rubber hosing (50) 1002 . male brass hose end assembly(1) 1003 female brass hose end assembly (1) 1004 metal clamp (2) 1002 Male brass hose end assembly 2001 male brass hose end (1) 2002 washer (1) 1003 female brass hose end assembly 2003 female brass hose end (1) 2002 washer (1) The bill ofmaterials for the 75 foot and 100 foot hoses are identical, except for requiring 75 and 100 feet of rubber hosing (item 1001) respectively. The times required for ordering and assembling are as follows: assembling each hose from its fIrst-level components takes 2 weeks _. assembling the maie and female hose end assemblies from their level 2 components takes 1 week lead time for ordering rubber hosing is two weeks lead time for ordering brass hose ends, washers, and clamps is one week
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

are157-homework-4 - A RE 157 ~.RU-tZO(O M.Whitney ANALYSIS...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online