Homework 5

Homework 5 - ECE 529 Utility Applications of Power...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ECE 529 Utility Applications of Power Electronics Session 43, Page 1/2 Spring 2009 ECE529 Homework #5 Due Session 45 (May 8 on campus, May 18 for Engineering Outreach) Problem 1: For the system below we want to increase the power transfer from Bus 1 to Bus 2 by adding a TCSC. From homework 2 we saw that the power transfer is 600MW with no compensation. Add a TCSC, with a capacitive reactance of 10.0ohm (at 60Hz) and an inductance of 8.0mH. Determine to transfer 800 MW. Determine TCR current and peak capacitor voltage when P12=800MW. Repeat for P12= 750MW BUS 1 |V V LL at BUS 2 j60 ohm |V 2 |= 345kV LL at -17.605 o Compensator Problem 2: For the system given, we want to increase power transfer from Bus 1 to Bus to 700 MW by adding a SSSC. The SSSC is controlled to inject a capacitive series voltage. If the SSSC is connected through a 4:1 transformer, with a leakage reactance of 0.1 p.u., determine the MVA, voltage and current supplied by the SSSC. The transformer is rated at 60 MVA and 5 kV (on the low voltage side facing the VSC)....
View Full Document

This note was uploaded on 03/19/2010 for the course ECE 529 taught by Professor Johnson,b during the Spring '08 term at Idaho.

Page1 / 2

Homework 5 - ECE 529 Utility Applications of Power...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online