LISTS2 - ramps both north and southbound. e 2.5 million...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Below is a list that is difficult to read and understand because it is not written in parallel form. Revise the list using an active verb to begin each idea. Some of the objectives of I-15 construction and reconstruction were as follows: e Widening the corridor to include an additional A general purpose @ lane, Utah = s first High Occupancy Vehicle (carpool) lane, and an auxiliary lane between
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ramps both north and southbound. e 2.5 million square yards of concrete to replace existing pavement. e The complete replacement of more than 130 bridges. e A new downtown access at 400 South for traffic traveling to and from the north. e A new I-15/I-80/Sr-201 junction. e The reconstruction of the 500/600 South downtown access. e Improvements to the I-15/I-215 junction....
View Full Document

This note was uploaded on 03/23/2010 for the course GEN 101 taught by Professor Sm during the Winter '10 term at University of Utah.

Ask a homework question - tutors are online