Copy of budget joti bank

Copy of budget joti bank - Joti Category 1 Consulantant Sub...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Joti Category Sub Category Sub total Category total 1 Consulantant Engineering 1300 0 Warranty 1200 Insurance 2100 Sub Total 4600 4600 2 Construction Plans 1,300 3 Building Permit 3,500 4 Survey 550 5 Excavation/Backfill/Tile Excavating 3,500 Truck/Dump fee 2500 Back fill Machine only 1500 Pipe/ filter cloth etc. 1500 Drain rock/ damp 2400 Labor (may be gen. lab) 1500 Sub Total 12,900 12,900 6 Backfill Material Sand 600 Gravel 1200 Pitrun Other Sub Total 1,800 1,800 Poles Underground Duck Hydro fee Hydro monthly bill 600 Propane 0 Generator 0 Heaters 0 Elecrition Wire/ Labor 250 Sub Total 850 850 Concrete 11,000 Pumping 1600 Other Sub Total 12,600 12,600 10 Framing Material 19,600 11 Framing Labour Foundations 3,000 Form 1,600 Steel 1,000 Framing 18,000 Back Framing 0 Sub Total 23,600 23,600 12 Trusses/Beam Trusses 5,500 Jacks Inpaction fee 150 Sub Total 5,650 5,650 13 Engineering Inspections 0 14 Roof Main roof 5,500 Divertors/ vent Safety ties 40 Other Sub Total 5,540 5,540 15 Windows
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 8

Copy of budget joti bank - Joti Category 1 Consulantant Sub...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online