When there is a standard batch size for production activity: A) The variable portion of the total flexible-budget variance for batch-related costs can be further decomposed into a spending and a volume variance, which leads to better cost control. B) Standard cost variances for only the variable portion of batch-related manufacturing overhead costs can be calculated.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: C) It is not possible to construct a flexible budget for cost-control purposes. D) A modification of the traditional approach to constructing the flexible budget for control purposes allows for a more detailed analysis of batch-related overhead costs....