BUS-A 325 #4

BUS-A 325 #4 - A) Flexible-budget variance. B)...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
BUS-A 325 #4 The difference between total factory overhead cost incurred during a period and the total standard factory overhead cost assigned to production of the period is the ______________:
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: A) Flexible-budget variance. B) Production-volume variance. C) Overhead efficiency variance. D) Total overhead spending variance. E) Total factory overhead variance....
View Full Document

This note was uploaded on 03/31/2010 for the course BUS-A 325 taught by Professor Campbell during the Spring '09 term at Indiana.

Ask a homework question - tutors are online