Question 1 1.1) 1.2) The critical path is C, G, H which takes 26 days (11 + 10 + 5) There are 5 total paths. The other possible paths are: - A, D, I which takes 18 days - B, E, I which takes 23 days - B, F, J which takes 25 days - C, G, K which takes 25 days 1.3) The path A, D, I would then take 25 days 1.4) 2 3 4 5 6 1 A = 5 B = 9 C = 11 D = 8 E = 9 F = 12 7 G = 10 H = 5 9 8 I = 5 J = 4 10 K = 4 A Start 5 C 4 B 9 D 2 E 5 F 6 Finish * * *
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1.5) Task Earliest start time Earliest finish time Latest start time Latest finish time Total float A 0 5 0 5 0 B 5 14 5 14 0 C 0 5 13 18 5 D 5 7 18 20 13 E 4 9 15 20 11 F 14 20 14 20 0 Question 2 2.1 Activity Optimistic (a) Most Likely (m) Pessimistic (b) Expected (te) Standard Deviation (s) A 3 4 5 4 0.33 B 1 2 3 2 0.17 C 2 3 4 3 0.33 D 4 5 6 5 0.33 2.2) z = (4 - 5) / 0.33 z = -3.03 2.3) 99% 2.4) The framework for dealing with risk includes 4 stages: 1. Risk identification – where risks are identified using brainstorming, checklists, or casual mapping. 2. Risk analysis and prioritization – where you calculate the potential damage that can be caused by a risk, the probability of its occurrence, then use those values to calculate the
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/08/2010 for the course ICT ICT2621 taught by Professor Na during the Summer '10 term at University of South Africa.

Page1 / 3

Assignment2 - Question 1 1.1) 2 A=5 E=9 1 B=9 3 F = 12 6 8...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online