Development Methodologies
Background image of page 2
Linear Development Waterfall Requires that one phase  be completed before the  next can begin Unrealistic Slow Costly Not easily maintained Analyze Define Design  Implement
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Linear Development Waterfall Requires that one phase  be completed before the  next can begin Fountain Allows for Summative  Evaluation  Post Mortem, and  tweaking Analyze Define Design  Implement
Background image of page 4
Iterative Development SDLC (9 Step Process) ADDIE Analyze Define Design Implement Evaluate Analyze Define Design  Implement Evaluate
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Iterative Development Restrictive Still Linear Long Time  Between A and I Between Customer and Product Between Milestones Responsibility  Payables Analyze Define Design  Implement Evaluate
Background image of page 6
Recursive Development Proto Typing Demonstrate functionality in cheap chunks Added a recursive step at each milestone Get buy-off Ownership Payment Caught problems early
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Recursive Development Proto Typing Demonstrate functionality in cheap chunks Added a recursive step at each milestone Rapid Proto Typing Design and Develop at the same time Decisions are made at the table Merge the business and technology Share Ownership
Background image of page 8
Bottom Line for PM Plan for Change Expect Embrace Get Started Prototype Build deliverable pieces Allow for growth
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Information Systems Roles Project Manager System Analyst Programmer/Developer Quality Control System Administrator Database Administrator Security and Audit
Background image of page 10
Project Manager Manage Project Resources Time Money People and Equipment Suppliers/Outsource Suppliers Bridges Technology and Business  issues Requires high level of attention to detail  and organization 
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
System Analyst Explores user wants/needs and creates  project definition Project Specifications Technical Specifications Must employ some methodology SDLC Prototyping Extreme Programming
Background image of page 12
Programmer/Developer Creates new applications C++, Java, Perl, Visual Basic HTML, Java Script, VB Script Maintains Legacy Systems Cobol, Fortran, C Proprietary Languages
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 14
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 49

DevelopmentSecurityandEthics - ISM3630...

This preview shows document pages 1 - 14. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online