class_ch.9

class_ch.9 - $6,500,000.00 n = 20 i = 8 Upgrade P =...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
B/C { PW(B)/PW(cost) { AW(B)/AW(cost) { FW(B)/FW(cost) 9.2 Initial Cost = 15,000,000 AW = 15,000,000(A/P Benefit = 1,500,000 Disbenefit = 200,000 500,000 Costs = 2,538,050 Benefit = 1,300,000 B/C = 0.512 Modified B/C = 0.393 9.3 Bypass P = $40,000,000.00 AW = $4,074,000.00 An. Main. = $1,500,000.00 B =
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $6,500,000.00 n = 20 i = 8% Upgrade P = $4,000,000.00 AW (4%)= $426,200.00 An. Main. = $150,000.00 AW (8%)= $530,800.00 B = $650,000.00 n = 12 i = 4% B/C Bypass = 1.17 B/C Upgrade = 1.13 B/C Upgrade(8%) = 0.95 No, at 8% it is not justified. ,6%.10) = 2,038,050...
View Full Document

{[ snackBarMessage ]}

Page1 / 2

class_ch.9 - $6,500,000.00 n = 20 i = 8 Upgrade P =...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online