Project_5

Project_5 - MJQ B D K N RT CE H I L P A OS G F I have...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
F P L I H G E C T S R O N K D B A Q J M “I have neither received nor given unsanctioned help in the completion of this assignment. I have not copied the ideas or work of others nor have I misrepresented myself or my work”, Joseph Murphy, Joshua Fundis, Brian Wolosky. Activi ty Description Duratio n Immediately Preceding (weeks) Activity A Form Project Team 1 - B Select Project Manager 1 A C Develop Project Charter 3 A D Develop Project Plan 4 B,C E Determine Min. Square Footage Requirements 4 D F Identify potential locations within existing Hospital 3 E G Evaluate existing UH layout and operations 4 E H Investigate consolidation options 3 F,G I Analyze infrastructure, communications & IT Systems 4 H J Complete schematic design for new department 5 M K Complete Cost Analysis 2 J,L L Determine Location 4 I M Develop Schematic Design 5 D N Decision: Use Existing or Build New 2 K O Determine Required Neurology Equipment 3 N P Determine Staff/Administrative Equipment
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

Project_5 - MJQ B D K N RT CE H I L P A OS G F I have...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online