Description Duration (weeks) A Form Project Team 1 B Select Project Manager 1 C Develop Project Charter 3 D Develop Project Plan 4 E Determine Min. Square Footage Requirements 4 F Identify potential locations within existing Hospital 3 G Evaluate existing UH layout and operations 4 H Investigate consolidation options 3 I 4 J Complete schematic design for new department 5 K Complete Cost Analysis 2 L Determine Location 4 M Develop Schematic Design 5 N Decision: Use Existing or Build New 2 O Determine Required Neurology Equipment 3 P Determine Staff/Administrative Equipment 4 Q Determine Training Equipment 3 R Determine Software Requirements 4 S Determine Staffing Objectives 3 T Develop Staffing Budget 5 Paths ACDEFHILKNOPRST ACDEFHILKNOQRST ACDEGHILKNOPRST ACDEGHILKNOQRST ACDMJKNOPRST ACDMJKNOQRST ABDEFHILKNOPRST ABDEFHILKNOQRST ABDEGHILKNOPRST ABDEGHILKNOQRST ABDMJKNOPRST
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.
  • Spring '10
  • McCabe
  • Harshad number, Prime number, C D E F G H I J K L M N O, Equipment Determine, Project Plan Determine, Plan Determine Min.

{[ snackBarMessage ]}

Page1 / 11

Project5 - Activity A B C D E F G H I J K L M N O P Q R S T...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online