TIM-500_Cost_HW

TIM-500_Cost_HW - costing more than planned The scheduled...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
“I have neither received nor given unsanctioned help in the completion of this assignment. I have not copied the ideas or work of others nor have I misrepresented myself or my work”, Joseph Murphy. PV = $23,000 EV = $20,000 AC = $25,000 BAC = $120,000 1. a. CV = EV – AC = $20,000 - $25,000 = CV = -$5,000. SV = EV – PV = $20,000 - $23,000 = SV = -$3,000. CPI = EV/AV = $20,000/$25,000 = 0.8 = CPI = 80%. SPI = EV/PV = $20,000/$23,000 = 0.8696 = SPI =86.96%. b. The project is not going very well so far. The cost variance is negative so, the project is
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: costing more than planned. The scheduled variance is negative so, the project is taking longer than planned. The schedule performance index is less than one so, the project is behind schedule . The cost performance index is less than one so, the project is over budget . c. EAC = BAC/CPI = $120,000/0.80 = $150,000. This project is worse than planned and will cost $30,000 more than estimated. d. Completion time = Original time (12 months)/SPI = 12/0.8696 = 13.8 months ....
View Full Document

This note was uploaded on 04/11/2010 for the course TIM 500 taught by Professor Mccabe during the Spring '10 term at SUNY IT.

Page1 / 2

TIM-500_Cost_HW - costing more than planned The scheduled...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online