QDM FINAL spring 2003 Key - QUANTITATIVE DECISION MAKING...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
QUANTITATIVE DECISION MAKING NAME__________________ FINAL TEST Spring 2003 Points Possible = 120 points POINTS = ______________ Work the following problems in your text. Show all of your work. Start each problem on a separate page. Submit all computer output generated in solving the problems. 1. Integer LP. (25 points) The Westfall Company has a contract to produce 10,000 garden hoses for a large discount chain. Westfall has four different machines that can produce this kind of hose. Because these machines are from different manufacturers and use differing technologies, their specifications are not the same. Machine Fixed Cost to Set Up Production Run Variable Cost Per Hose Capacity 1 750 1.25 6000 2 500 1.50 7500 3 1000 1.00 4000 4 300 2.00 5000 a. This problem requires two different kinds of decision variables. Clearly define each kind. b. The company wants to minimize total cost. Give the objective function. c. Give the constraints for the problem. d. Write a constraint to ensure that if machine 4 is used, machine 1 cannot be. e.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 5

QDM FINAL spring 2003 Key - QUANTITATIVE DECISION MAKING...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online