Week2.Case Study ECS - Milestone 2 Solution

Week2.Case Study ECS - Milestone 2 Solution - MILESTONE 2...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
I Problems, Opportunities, Objectives, and Constraints Matrix PROBLEMS, OPPORTUNITIES, OBJECTIVES AND CONSTRAINTS MATRIX Project: Equipment Check-Out System Project Manager: (instructor name) Created by: (student name) Last Updated by: (student name) Date Created: 03/22/2004 Date Last Updated: 03/22/2004 CAUSE AND EFFECT ANALYSIS SYSTEM IMPROVEMENT OBJECTIVES Problem or Opportunity Causes and Effects System Objective System Constraint 1. It takes too long to process a single equipment check-out. Cause(s): 1. Employee and equipment records are maintained manually and are tedious to locate. Effect(s): 1. It takes 2 to 10 minutes to process a single equipment check- out. 2. There are lines of employees having to wait to check in and out tools at the end and beginning of each shift. 3. Employee resentment toward Equipment Depot is growing. 1. Reduce the amount of time it takes to process a single equipment check-out to less than two minutes. Unknown
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/22/2010 for the course CIS CIS321 taught by Professor Burnham during the Spring '10 term at DeVry Arlington.

Page1 / 4

Week2.Case Study ECS - Milestone 2 Solution - MILESTONE 2...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online