wk 4 team paper - Riordan Analysis 1 RUNNING HEAD: Riordan...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Riordan Analysis 1 RUNNING HEAD: Riordan Manufacturer Analysis Riordan Manufacturing Process Analysis Darron Ottley University of Phoenix Operations Management OPS/571 Paula Billups September 15, 2009
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Riordan Analysis 2 The Cook Process Analysis Introduction – 150 words. Darron As a team, write a 1,050-word (maximum) APA-formatted paper discussing strategic capacity planning and lean production for the new process design and supply chain process for the electric fans at Riordan. In order to complete the Week Four team assignment, you will need to fast forward to the Week Six individual assignment. Based on your reading of the instructions to the Week Six individual assignment, you will note that you will be preparing a Materials Resource Plan for the manufacture of electric fans at Riordan Manufacturing. The purpose of the Week Four assignment is to help you develop a framework for the Week Six assignment. Working in a team will allow you to brainstorm with partners as a way of
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/23/2010 for the course BUSINESS 551 taught by Professor Charnell during the Spring '10 term at University of Phoenix.

Page1 / 4

wk 4 team paper - Riordan Analysis 1 RUNNING HEAD: Riordan...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online